The completed entry gate on the visitors' side of the stadium (1/30/12)
View of the field house site from the 50 yardline (1/30/12)
View of the field house site from the home stands (1/20/12) - The first floor exterior wall is nearly complete, and structural steel for the second floor can be seen in the background.
View of the field house site from the construction entrance (1/30/12) - The first floor exterior wall is nearly complete.
View of the field house site from the construction entrance (1/30/12) - The first floor exterior wall is nearly complete and the front entrance is taking shape.
View of the field house site from the hill behind the stadium (1/31/12) - Structural steel is currently being put into place.
View of the Field House site from the 50 yardline (2/6/2012) - Structural steel to support the second floor and roof has been installed and the second floor is currently being put in place.
View of the Field House site from the home stands (2/6/2012) - Structural steel to support the second floor and roof has been installed and the second floor is currently being put in place.
View of the Field House site from the 50 yardline (2/17/2012) - The second floor is currently being surfaced.
View of the Field House site from the home stands (2/17/2012) - The second floor is currently being surfaced.
View of the Field House site from the 50 yardline (2/29/2012) - The second floor exterior walls are being put in place.
View of the Field House site from the home stands (2/29/2012) - The second floor exterior walls are being put in place.
View of the Field House site from the 50 yardline (3/11/2012) - The second floor exterior walls have been sheathed and the first layer of insulation has been added.
View of the Field House site from the home stands (3/11/2012) - The second floor exterior walls have been sheathed and the first layer of insulation has been added.
View of the Field House site from the 50 yardline (3/13/2012) - The trusses for the roof are being installed.
View of the Field House site from the home stands (3/13/2012) - The trusses for the roof are being installed.
View of the Field House site from the 50 yardline (3/13/2012) - The installation of the trusses is nearing completion.
View of the Field House site from the home stands (3/15/2012) - The installation of the trusses is nearing completion.
View of the Field House entrance (3/15/2012) - The installation of the trusses is nearing completion.
View of the Field House site from the 50 yardline (3/27/2012) - The final trusses are being installed and the roof is being sheathed and prepared for shingles.
View of the Field House site from the home stands (3/27/2012) - The final trusses are being installed and the roof is being sheathed and prepared for shingles.
View of the Field House site from the 50 yardline (3/29/2012) - The roof is being sheathed and the decorative dormers are being installed.
View of the Field House site from the home stands (3/29/2012) - The roof is being sheathed and the decorative dormers are being installed.
View of the Field House site from the 50 yardline (4/9/2012) - The final decorative dormer being installed during the "Topping-Off Ceremony"
View of the signatures on the dormer, raised into position during the "Topping-Off Ceremony" (4/9/2012)
View of the signatures on the dormer, raised into position during the "Topping-Off Ceremony" (4/9/2012)
View of the Field House site from the home stands (4/9/2012) - The final decorative dormer being installed during the "Topping-Off Ceremony"
View of the Field House site from the rear of the King Center (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.
View of the Field House site from the 50 yardline (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.
View of the Field House site from the home stands (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.
View of the Field House site from the southeast corner (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.