The completed entry gate on the visitors' side of the stadium (1/30/12)
|
View of the field house site from the 50 yardline (1/30/12)
|
View of the field house site from the home stands (1/20/12) - The first floor exterior wall is nearly complete, and structural steel for the second floor can be seen in the background.
|
View of the field house site from the construction entrance (1/30/12) - The first floor exterior wall is nearly complete.
|
View of the field house site from the construction entrance (1/30/12) - The first floor exterior wall is nearly complete and the front entrance is taking shape.
|
View of the field house site from the hill behind the stadium (1/31/12) - Structural steel is currently being put into place.
|
View of the Field House site from the 50 yardline (2/6/2012) - Structural steel to support the second floor and roof has been installed and the second floor is currently being put in place.
|
View of the Field House site from the home stands (2/6/2012) - Structural steel to support the second floor and roof has been installed and the second floor is currently being put in place.
|
View of the Field House site from the 50 yardline (2/17/2012) - The second floor is currently being surfaced.
|
View of the Field House site from the home stands (2/17/2012) - The second floor is currently being surfaced.
|
View of the Field House site from the 50 yardline (2/29/2012) - The second floor exterior walls are being put in place.
|
View of the Field House site from the home stands (2/29/2012) - The second floor exterior walls are being put in place.
|
View of the Field House site from the 50 yardline (3/11/2012) - The second floor exterior walls have been sheathed and the first layer of insulation has been added.
|
View of the Field House site from the home stands (3/11/2012) - The second floor exterior walls have been sheathed and the first layer of insulation has been added.
|
View of the Field House site from the 50 yardline (3/13/2012) - The trusses for the roof are being installed.
|
View of the Field House site from the home stands (3/13/2012) - The trusses for the roof are being installed.
|
View of the Field House site from the 50 yardline (3/13/2012) - The installation of the trusses is nearing completion.
|
View of the Field House site from the home stands (3/15/2012) - The installation of the trusses is nearing completion.
|
View of the Field House entrance (3/15/2012) - The installation of the trusses is nearing completion.
|
View of the Field House site from the 50 yardline (3/27/2012) - The final trusses are being installed and the roof is being sheathed and prepared for shingles.
|
View of the Field House site from the home stands (3/27/2012) - The final trusses are being installed and the roof is being sheathed and prepared for shingles.
|
View of the Field House site from the 50 yardline (3/29/2012) - The roof is being sheathed and the decorative dormers are being installed.
|
View of the Field House site from the home stands (3/29/2012) - The roof is being sheathed and the decorative dormers are being installed.
|
View of the Field House site from the 50 yardline (4/9/2012) - The final decorative dormer being installed during the "Topping-Off Ceremony"
|
View of the signatures on the dormer, raised into position during the "Topping-Off Ceremony" (4/9/2012)
|
View of the signatures on the dormer, raised into position during the "Topping-Off Ceremony" (4/9/2012)
|
View of the Field House site from the home stands (4/9/2012) - The final decorative dormer being installed during the "Topping-Off Ceremony"
|
View of the Field House site from the rear of the King Center (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.
|
View of the Field House site from the 50 yardline (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.
|
View of the Field House site from the home stands (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.
|
View of the Field House site from the southeast corner (4/16/2012) - The roof is currently being shingled and significant work begins on the interior of the building.
|